380V 7Kw Full-Automatic Stator Winding Machine with 12 Months Warranty for High Efficiency Washing Machine Manufacturing
Productoverzicht
2 Winding Heads Electrical Motor Automatic Stator Winding Machine for Washing Machine Manufacturing / Double Head This machine features two winding heads with four working stations, capable of simultaneously winding main and auxiliary phases. Designed for high production capacity applications, it ...
Product aangepaste attributen
380V Stator Winding Machine
,7Kw Automatic Stator Winding Machine
,12 Months Warranty Electrical Winding Machine
Basis eigenschappen
Handelsgoederen
Productbeschrijving
| Model | SMT-LR100 | SMT-LR150I | SMT-LR150 II | SMT_LR200 | SLR70 | QLR70 |
|---|---|---|---|---|---|---|
| Winding Head | 1 | 1 | 1 | 1 | 2 | 4 |
| Wire Diameter(mm) | 0.3~1.0 | 0.3~1.0 | 0.3~1.2 | 0.3~1.2 | 0.2~1.0 | 0.2~1.0 |
| Unload Speed | ≤2500r/min | ≤2500r/min | ≤2500r/min | ≤2000r/min | 3000 | 3000 |
| Stack Height | ≤80mm | ≤120mm | ≤150mm | ≤230mm | ≤70mm | ≤70mm |
| Winding Precision | + 0 | + 0 | + 0 | + 0 | + 0 | + 0 |
| Power Supply | 380v/50/60HZ 8Kw | 8Kw | 9Kw | 7Kw | 7Kw | 7Kw |
| Air Pressure | ≥0.6Mpa | ≥0.6Mpa | ≥0.6Mpa | ≥0.6Mpa | ≥0.6pa | ≥0.6pa |
| Weight | ≈1350Kg | ≈1600Kg | ≈1600Kg | ≈2200Kg | ≈1950Kg | ≈2300Kg |
| Dimension (L×W×Hcm) | 180×110×200 | 180×120×220 | 180×130×230 | 220×180×250 | 180×130×205 | 135×100×180 |
- Double winding heads with turntable design for efficient operation
- Servo-controlled main spindle with ±1 turn accuracy
- PLC-controlled parameters including turn number, winding speed, and tension
- Supports both continuous and discontinuous winding methods
- Capable of handling 2, 4, and 6 pole coils
- Tooling change can be completed in approximately 15 minutes
- Automatic wire detection with machine stop function
- Low vibration and noise operation
- Touch screen interface for easy operation and monitoring
- Conduct pre-operation checks of mechanical, electrical, and hydraulic components
- Clean dust and reset machine after each use
- Clean electrical components every three months
- Regularly check and maintain hydraulic system filters and lubricators
- Inspect guide mechanism lubrication status
- Check magnet valve screws and pipe joints quarterly
- Inspect filters and air filters every two months
- Annual air pressure check recommended
- Regular mechanical oil application required
Neem contact op met onze experts en krijg een gratis consult!
Onze missie is om "High Quality" & "Good Service" & "Fast Delivery" aan te bieden om onze klanten te helpen meer winst te maken.